- Ordering Information & Dimensions
 - How To Order
 - Specification
 - Features
 
How To Order
| VCGC | - | 04 | M | 08 | M | 04 | M | - | SL | - | BA | 
| Valve Type |  Inlet Connection Size  | Connection Type  | Outlet Connection Size  | Connection Type  | Vacuum Connection Size  | Connection Type  | Body Material  | Surface Finish Level  | |||
| Valve Type | Inlet Connection Size | Materials | |||||||||||
| VCG | Vacuum Generator | Fractional(Inch) Tube O.D. Designation | LV | 316L VAR | |||||||||
| Tube O.D  | inch | 1/4 | 3/8 | 1/2 | LF | 316L SEMI F20 | |||||||
| Connection Type | mm | 6.35 | 9.52 | 12.7 | SL | 316LSS | |||||||
| C-*M | Male UCR | Designator | 04T | 06T | 08T | ||||||||
| C-*F | Female UCR | Surface Finish Level | |||||||||||
| WB- | Tube Butt Weld | UCR Size Designator | BA | BA - Bright Annealing | |||||||||
| UCR Size | 1/4 | 1/2 | EP | EP-Electro Polished | |||||||||
| Designator | 04 | 08 | |||||||||||
Specification
| Orifice Size | 1.35mm | 
| Ultimate Vacuum | 50torr (66.7mbar) | 
| Gas Flow at Ultimate | 60 l/min | 
| Gas Pressure at Ultimate | 80psig | 
| Optimize working Pressure | 80~100psig | 
| Max. Working Pressure | 150psig (10kgf/cm²) | 
| Operating Temperature | 0~150℃ | 
Helium Leak Test
Every VCG series are inboard helium leak tested to a rate of 1x10-9 cm3 /sec.
Particle Contribution Test
According to ASTM F1394-92.
Moisture Contribution Test
According to SEMA-90120397B-STD.
Vacuum and Flow Chart

Cleaning
All components are precisely cleaned with 18㏁ deionized water after the passivation procedure in accordance with our own UHP cleaning process Reference specification : SEMI E49.6.
Packaging
Each component is double bagged to ensure component cleanliness and to protect them from environmental contamination.
Referenced specification : SEMI E49.1.
Features
· Function of the pressure of the purge gas which flows through the generator.
· Low space requirement. 
· Extremely fast evacuation time.
· All performed in class 100 and class 10 clean rooms.
· Stainless Steel 316L construction.
						
					
					
                            
                        
			
		                        				                                        
                
                
                        
                        



                                            
                                        
							
				
				
				
				
	
            
            top
        